Exterior Painting in Volusia and Seminole Counties
The paint on your house is chalking off on your hand, peeling at the trim, or showing dark streaks on the north wall that come back a month after you wash them. You have probably already had a quote that said “pressure wash and two coats” and wondered what that leaves out.
Most of what decides whether an exterior paint job lasts happens before any paint is opened. Here is the work in the order it happens, what moves the price, and what is different about doing it on Central Florida houses.
What the work is, start to finish
- Walk and mark. Before anything gets wet, the crew goes around the house and marks what needs attention: hairline stucco cracks, failed caulk, soft wood, stained or chalking areas, and anything touching the wall that should not be.
- Wash. Low-pressure washing removes dirt, chalk and mildew. Stucco is not siding. Too much pressure drives water into cracks and blows the face off soft spots, so the pressure and tip are chosen for the surface.
- Dry time. Block and stucco hold water. A wall that looks dry on the surface can still be damp a few millimeters in, and paint applied over it blisters. The wall gets the time it needs.
- Repair. Cracks are opened slightly, filled with a flexible patch and feathered into the texture so the repair does not show as a smooth scar. Rotted trim and fascia are cut out and replaced with matching material.
- Seal and caulk. Every penetration gets attention: window frames, hose bibs, light fixtures, vents, dryer exhausts, electrical boxes, and the joint where trim meets wall. Water finds the smallest gap.
- Prime bare spots. Patched stucco, new wood and bare block get primed before the finish coat. Skipping this is why repairs show up as dull or flashing patches a year later.
- Coat. The finish goes on in the number of coats the surface calls for, with trim, doors and accents done in the same visit so the lines stay clean.
- Walk again. The crew goes back around in daylight, touches up anything missed and removes masking.
What moves the price
- Height and stories. A two-story wall takes more setup and more time than a single-story wall of the same width. Ladders and lifts cost more than walking the ground.
- Condition of the existing coating. Sound paint needs cleaning and a fresh coat. Peeling, bubbling or heavily chalked paint has to be scraped or dealt with first, and that is slow, careful labor.
- Amount of stucco repair. A handful of hairline cracks is an afternoon. Cracks all over the elevations, or spalled areas where stucco has let go, take real time to patch and blend.
- Wood rot. Fascia, soffit, window trim and garage door trim are the places water gets in. How much rot there is cannot be known until the paint is off and a screwdriver goes in, which is why you will get a range of possibilities rather than a promise on the unseen.
- Mildew and shade. North walls and anything under heavy oak or palm canopy carry more growth and take more cleaning.
- Trim and detail. Shutters, columns, decorative bands, multiple colors and a lot of window divisions all add hand work.
- Obstacles. Landscaping against the wall, tight side yards, pool cages, screened enclosures and sprinkler heads that spray the wall all affect setup time.
- The coating you choose. Different coating systems have different cost and lifespan. That conversation happens at the estimate, with your house in view.
- HOA requirements. If the association controls colors or finishes, the work has to match what was approved.
What is different about Central Florida houses
- Block with stucco. A large share of the housing across Volusia and Seminole counties, especially anything built before 2000, is block with stucco over it. Block is porous. It takes on moisture from the ground, from rain driven sideways and from sprinklers, and it releases that moisture through the paint. When the coating is too thin or the wall was damp when painted, the water pushes the paint off from behind.
- Efflorescence. The white powdery crust on a block wall is salt carried out by moisture. It means water is moving through the wall. It has to be brushed and cleaned off before painting, and the source of the moisture needs to be found, because the paint will not stop it.
- Efflorescence. The white powdery crust on a block wall is salt carried out by moisture. It means water is moving through the wall. It has to be brushed and cleaned off before painting, and the source of the moisture needs to be found, because the paint will not stop it.
- Humidity and mildew. With this much moisture in the air, shaded elevations grow mildew on almost any surface. Painting over it without cleaning means painting over living growth. It comes through.
- Termites. Both subterranean and drywood termites are active in this region. When trim or fascia comes off during prep and there is damage or mud tubes behind it, the work on that section stops. The honest next step is a pest professional looking at it, then the damaged wood gets replaced, and then it gets painted. Paint over active termite damage hides the problem and does nothing about it.
- Age of the stock. Neighborhoods in Deltona, DeBary and Orange City have a lot of homes from the 1970s through the 1990s, where original stucco has had decades of movement and patching. Newer subdivisions in Lake Mary, Oviedo and Winter Springs often have thinner stucco or fiber cement trim, and different weak points.
A common misconception
Sometimes the product is the issue. Far more often the paint failed because the wall was damp, dirty or chalky when it went on, or because a gutter, a roof edge or a sprinkler head keeps soaking one spot. A premium coat over bad prep fails just like a cheap coat, only more expensively.
Paint also does not fix water entering from behind. If a window frame is leaking, a hose bib is dripping inside the wall or the roof line sheds water onto the stucco, the water source has to be dealt with by the right trade. Iron Site paints, repairs stucco surfaces, replaces trim and caulks. If a leak points to roofing, plumbing or a structural crack that is wider or more stair-stepped than a normal hairline, we will tell you plainly and you will need that licensed trade to look at it first.
What to do before the estimate
- Walk the outside of your house and press your hand on each wall. If white or colored powder comes off, the paint is chalking.
- Look at the bottom of fascia boards, the tops of window trim, and the bottoms of garage door and entry door frames. These are where rot starts.
- Note any area where the wall stays wet or streaked after rain or after the sprinklers run.
- Trim back shrubs and vines that touch the walls if you can.
- Gather your HOA contact and any approved color list. In large parts of Lake Mary, Heathrow, Winter Springs, Oviedo and the newer subdivisions, an exterior color change needs architectural review before the first brush.
- Take photos of anything that worries you.
- Have a rough idea of the colors you want, and which parts of the house are included: trim, doors, garage door, shutters, fascia, soffit.
Where the work gets done
Iron Site works across Volusia and Seminole counties, from Orange City and Deltona through Sanford, Lake Mary, Longwood, Winter Springs, Altamonte Springs and Oviedo, and east to Port Orange.