Kitchen Remodeling in Volusia and Seminole Counties
What the work is, in the order it happens
- Walkthrough and measure. We look at where the sink, range, refrigerator and dishwasher sit, check the ceiling and soffit, and look at the floor you have now. This is where we find out whether the plan stays in finish scope.
- Protect and demo. Floors and adjoining rooms get covered. Doors, uppers, soffit, old countertops and old flooring come out. Iron Site also does junk removal, so the debris leaves with us.
- Repair what demo exposes. Drywall gets patched, hung or finished. Ceilings get repaired, and any popcorn texture is handled the way described below.
- Prime and paint. Ceiling and walls are painted before cabinets go in, while the room is empty and easy to cut in.
- Set cabinets. Base cabinets go in first and are leveled, then uppers are hung and tied together. Cabinets can be new or refaced.
- Template and install countertops. The template is taken after the cabinets are set, not before.
- Backsplash. It goes on after the countertop so the joint lines up cleanly.
- Flooring. Vinyl plank goes in after the slab check, floated around the cabinet boxes.
- Trim, hardware and lighting. Baseboard, crown, toe kicks, pulls and knobs go on, along with like-for-like fixture swaps on existing boxes.
- Final paint touch-up and cleaning. We walk the room with you.
The decisions that move the price
- Does the sink stay where it is? This is the largest fork. Your house is almost certainly on a slab, so moving the sink means cutting the concrete, running new drain line, patching the slab and bringing in the licensed plumbing trade. That adds cost, dust and days. Leave the sink and appliance walls where they are and the whole job stays in finish scope, at a fraction of what most people expect.
- New cabinets or refacing. If the boxes are sound and the layout works, refacing keeps the existing boxes and replaces doors, drawer fronts and hardware. If the boxes are swollen, sagging or badly laid out, new cabinets are the better money.
- RCountertop material and edge. The material sets the price, and so does the amount of fabrication: cutouts, waterfall edges, seams and thick profiles all add shop time.epair what demo exposes. Drywall gets patched, hung or finished. Ceilings get repaired, and any popcorn texture is handled the way described below.
- Soffit removal. Taking out the soffit opens the ceiling and lets taller uppers run to the ceiling. But soffits often hide a duct run, a vent or wiring. If something is in there, it stays boxed in or the licensed trade reroutes it.
- Flooring under the cabinets or around them. Running plank under cabinets means pulling them later when the floor needs repair. Floating it around them is simpler, and it is how we install it.
- Lighting. Swapping a fixture on an existing box is a finish item. New circuits, recessed cans or relocated switches belong to a licensed electrician.
- What demo uncovers. Old subfloor, hidden damage and out-of-plumb walls are the usual surprises, and they are the reason a fixed number given over the phone is not worth much.
Doing this on Central Florida houses
- Block walls. Most houses built here before 2000 have exterior walls of concrete block with furring strips and drywall over them. There is no wall cavity to snake wire or pipe through, so new outlets, new switch locations and new lines mean chasing block, and that is electrician or plumber territory. For cabinets, it means uppers are fastened into furring or block with the right anchors, not just hung from drywall.
- Slab on grade. There is no crawlspace and no basement, so everything under the floor is concrete. That is why the sink decision above matters so much.
- Humidity. Kitchen cabinets near a dishwasher, under a sink or beside an exterior door take a beating in this climate. Edges swell, finishes lift and particleboard fails first. When we look at your existing boxes, that is what we are checking.
- Popcorn ceilings. These were standard here from the sixties into the eighties. On anything built before the mid 1980s, the texture gets tested before it comes down. A positive result means licensed abatement, not a scraper and a spray bottle. Iron Site does not remove asbestos.
- Termites. Subterranean and drywood termites are both common. When a base cabinet or a section of baseboard comes off in an older house, we sometimes find damage. If we do, work in that area stops, we show you what we found with photos, and you bring in a pest professional. Repairs to the affected wood are scoped after that, as a separate decision.
- Age of the housing stock. Across Volusia and Seminole, you will find everything from sixties block homes in Deltona and Orange City to newer builds in Lake Mary and Oviedo. The older the house, the more likely the soffit hides something, the more likely the walls are out of plumb, and the more likely the floor needs attention.
A common misconception
Most people assume a kitchen can be ordered start to finish before demo: cabinets, countertop and backsplash all lined up in one shot. In practice, the countertop cannot be fabricated until the cabinets are set, because the template is taken from the installed boxes, not from the plan. That is why there is a gap between cabinet install and countertop install, and why a kitchen without a countertop for a stretch of days is normal, not a sign something went wrong. It is also why we ask you to choose countertop material early, so the template visit is not the thing holding up the schedule.
What Iron Site handles and what the licensed trades handle
Iron Site handles the finish scope: cabinets, countertops, backsplash, flooring, paint, trim, lighting swaps and hardware, plus drywall and ceiling work around them.
When a kitchen needs plumbing relocated, wiring run, a wall altered or a permit pulled, the licensed trade does that portion, and the licensed contractor doing that portion pulls the permit. Volusia County, Seminole County and the cities in between each handle permits their own way. Paint, cabinets and flooring generally do not need one. Moving plumbing, altering a wall or changing an opening does. Iron Site handles everything around the licensed work and keeps the schedule together so the trades arrive in the right order.
What to have ready before the estimate
- Photos of every wall of the kitchen, including the ceiling and the soffit.
- A note of what bothers you most about the room, so we scope what matters first.
- Any cabinet, countertop or flooring samples you have already picked, or at least the look you are after.
- Appliance details, especially if you are replacing the range, refrigerator or dishwasher, because sizes change cabinet layouts.
- A look at the floor along exterior walls and near the sink for soft spots, stains or cupping.
- The year the house was built, if you know it, since it tells us whether the ceiling needs testing.
- Any HOA rules, if your community has them.
Where the work gets done
Iron Site is based in DeBary and takes kitchen work across Volusia and Seminole counties, and you can see the full list on the service area page.
Call Iron Site at (386) 345-2852 or use the form on this page to set up a free kitchen walkthrough.